Week 28: Baths and Toilets

This week has seen our baths and toilets gone in, upstairs floors have been sanded for carpet..
So far that is what the house stands at. Oh and I believe the garage door will be going on as well.

Also should mention, the glass blocks that are meant to be going in the granny flat bathroom; we have ANOTHER issue. Hubby has to go back and make the opening bigger because oh what do you know, wrong measurements were given to him. There comes a point during your build that when you get these types of news, all you can do is just laugh.

SS called us and said walk through with THEIR boss will happen smack bang on week 30.

This is whats in store for us

Week 29: Locks on doors and other small stuff to happen
Week 30: Main floor tiling and carpet (Walk through with Wisdom SS's boss)
OVER TIMELINE
Week 31: Anything that needs to be fixed up will be done this week as per boss's advise.
Week 32: Our walk through.
Week 33: Hopefully Handover.

Lets see how things progress.

Not too happy about going overtime but whatever, at this point I am just not feeling it anymore. So disappointing cause this is meant to be something everyone should look forward to.
WELL NO, not anymore. So exhausted of the whole process and emotional roller coaster.

Anyway, hopefully it will get better and things will just flow from here. Don't want to give myself false hope but hey, if you don't have hope, what do you have right?