Sunday, July 29, 2018

Week 27: Not much was done

Yep, one whole week went passed and not much else was done.
I think the painter went back to do a few things but other than that, we had the promise of shower screens and tapware but nothing..........

So very unfortunate.

Sunday, July 22, 2018

Shopping: Washer/Dryer, TV and Microwave

So, this weekend hubby and I went out shopping for a fridge. Unfortunately we bought many other things besides the fridge. Isn't that just always the case?

All things were from Bing Lee as they have good prices and warranties. They also had a promotion with a gift card which ended Sunday so we spent hours upon hours reading reviews of different things and finally came to an agreement and bought everything (besides the fridge we went out for) all in one go.

Below are our selections:

Electrolux Washer/Dryer
EWW14013
Price: $1,470.00
Now I know there's so much stigma that is applied to the washer/dryer combos however I really think after reading some reviews online that it could potentially be the best washer we have had as long as we know how to use it with its proper functions. We got an added 4 Year Warranty for this machine at $199.00


The next Item I'd like to talk about is the TV we purchased.
We didn't want a MASSIVE TV, so we went with a 65" LG Super UHD HDR Smart TV.

Model: 65UK7550PTA
Price: $2595.00
Added 4 Year Warranty $319.00


and now our microwave. This was a whim purchase as we weren't planning to purchase a microwave however it was done because we needed a new one. This is a LG 25L S/S Smart inverter 1100W

Model: MS2596OS
Price: $199.00
Added 2 Year Warranty: $30.00

I think considering all that we got, we got an okay price but probably splurged a little on the washer/dryer.

Now all that is left is to purchase a fridge... which was our original intent this weekend.

Week 26.1 - Bathrooms Completed & Other Bits

End of week 26 saw the below all being completed or started:


-          Wall tiles complete.
-          Benchtops in for the kitchen.
-          Painting started
-          Niches done with mosaics
-          Benchtops in bathroom complete
-          Sinks on in the bathroom
-          Kitchen sink went in
-          Painting started
-          Cupboard doors painted
-          Window architraves painted
-          Stairwell gypbrocked
-          Mosaic tiles in bathroom complete
-          Air vent cutouts done
-          Power point cutouts done

Also, more good news is that our SS called and said we may be able to have walk through in 4 weeks!

We are beyond excited at this point. Cannot believe this is actually happening and that we may be in our brand new home next month! 

Some photos below :) 

Shower Niche Mosaic Tiles

Vanity tops and sink

ensuite Shower

Ensuite Vanity

Air vent cutouts

Leisure Room Electrical Cutout

Kitchen Sink

Kitchen Benchtops

Powder Room

Laundry


Single Toilet Upstairs

Main Bath Upstairs Shower

Monday, July 16, 2018

Beacon Lighting Update

So, on my last post I stated that we had chose our lighting. I decided to upload some photos of what we had chosen just so I can look back at these posts when it is all done and remember all the steps it took to get there!

Firstly, our dining room will have three pendants all the same on a white bar from Beacon as per below.

There will be the below pendants hanging on this bar all the same length.

Light for the stairwell:

 All the bulbs will be the same as the below as we wanted to keep it uniform and structured.

Next is our alfresco light/fan :)


I am so excited to see all our selections come together!
Not long to go now for us and it is just so hard to concentrate on anything else when I know that we could be moving so soon. I have a little bit of anxiety packing all my stuff though I must say. Especially all my products and makeup - eeeeeeeeeek.

Sunday, July 15, 2018

Week 26: Kitchen Benchtop's & Bathroom Wall Tiles

I know I just gave an update for end of week 25 however, hubby was on site today to check on the build and sent me these photos which practically almost stopped my heart from excitement.

Monday - we have had the wall tiles started, kitchen bench tops went in AND PAINTING HAS STARTED!

One more bit of good news is that hubby spoke to the tiler today and he gave us an insight and said the main floor tiles are due to be laid in 2 weeks along with the carpet after all the inside finishing are done! Does this mean they are going to push to have all the mirrors all the screens. all the everything else done by two weeks? What?! Lets hope this is the case cause I just really need to be in my new home!

Its really starting to look like a home now and I am beyond excited.

Below photos :)




Week 25: Bathroom Tiling Started & Other Bits

So, end of week 25 saw quite a bit of work completed which was amazing news to my ears!

- Bathroom floor tiling completed
- Bathroom vanities complete.
- All sliding doors and internal doors in as well as cupboard doors.
- Mosaic tiles were laid on the floor ready to be laid behind the sinks and inside the niches.
- Architraves finished.

Also, we are excited to say we finally went to Beacon Lighting and chose pendants for our dining room, alfresco and stairwell. All up this cost us about $800.00. Also deciding if we would like Sean their electrician to fit them for us as if we decide this, we would receive an extra year warranty on our alfresco fan/light. Something to think about I guess....

On another note, the only thing I packed this weekend was my printer. We ended up purchasing one of those internet dongle things (because we don't currently have internet at our place) and we ended up watching 13 reasons why on Netflix all weekend which was probably one of the best weekends I had in a while.

Anywho, we are now 4 weeks from contract date. Lets see what else is in store for the forthcoming days/weeks.









Sunday, July 8, 2018

Week 24.1: Kitchen is in!

Hi all,

I am very pleased to say that our kitchen is in! We decided this weekend we wouldn't go visit the block (only because we had a few things to do) annnnnd no, we didn't get a chance to go to Beacon lighting or select our blinds. I am a little scared now as we are probably going to be pressed for time

Anyway, hubby's brother stopped by the block as him and his wife are building very close to us and he called to say our kitchen went in this week! Unfortunately we don't really get thorough updates from the supervisor but thats okay as long as our build is going smoothly and things are actually progressing on site.

SS did tell us however that the guy who was doing the doors hurt himself (very sad) so I'm not sure if he will be continuing the job or if they will assign someone else to the job. I'm really hoping this doesn't hold us up any longer than all the delays we have had. I have been seeing on fb that many people have already received their keys to their home and I was so envious!

Soon enough I guess. This week is week 25, so there is 5 weeks left in our contract build time.
I really truly hope they can stick to this and just get it done.

Also, an update... our party wall was supposed to be rendered however it was covered in gyprock so we ended up getting a deduction on our total price as it was factored in on our contract. -$3k. I know its not much, but every cent counts right?

Here are some pictures below thanks to my brother in law :)




Tuesday, July 3, 2018

Week 24: Update from SS

Hi guys!

So hubby spoke to our SS yesterday and he said there is going to be a lot of progress done on the house within the next two weeks.

- Kitchen delivery & Installation.
- Bathroom Vanities delivery & Installation.
- Electrical cut outs.
- Doors to be fitted.
- Architraves to go on.
- Tiling begins most likely towards end of week 25.

How exciting!

I am pretty happy with this given that we have had so many weeks with no one on site, I feel like hopefully this will make up for it (if the tradies show up and do the work).

However, there is still so much to be done by us!

- We still need to choose our blinds/shutters.
- Still to choose our lighting.
- Still to purchase a new Fridge.
- Still to purchase a Washing machine.
- Still to purchase a dryer.
- Still to purchase my own ikea wardrobe!

The things we need to do before we move in are quite critical to me as we have a puppy and the fences need to be installed and there needs to be grass before we can move. I'm starting to fear that we won't have time as hubby works most weekends and cant really work on the house. Might need to ask some family members for some help.

How far am I in my packing stage? haha do not ask. So far all I've done is clear out my wardrobe of old a dingy clothes and clothes that I practically didnt wear.
Next steps for me would be to:
- Clean out my shelves!
- Pack my paintings and frames that we are not using.
- Go through my products (hair etc).

HOPING we have six weeks to go, I need to get my sh*t sorted. Eek.

Monday, July 2, 2018

Week 23: WE HAVE STAIRS!

Can I get a hallelujah!

It is about time that we got our stairs!

Decided to do a drive by to the house on Sunday last week as our SS did not call us for an update. Went there and found that they had installed our stairs. Walkeda round the home as per usual to see if there was anything else that was different and they had made little cuts inside the gyprock as to where they would cut out the circles for the light fixtures.

Our doors were also delivered! So, without speaking to our SS I am going to ASSUME that the doors should be going on this week, and the electrical cut outs should be happening also.

Di Lorenzo had notified us to let us know that the tiles we chose for our bathroom were out of stock which was a great big bummer but we got over it and chose new ones. The lady who served me at Di Lorenzo also told me that our site was released for tiling mid July which I am hoping by then we will have our kitchen and bathroom deliveries.

It's getting close now and I can taste it!

Really just want to move innnnnnnn