Showing posts with label gyprock. Show all posts
Showing posts with label gyprock. Show all posts

Sunday, July 22, 2018

Week 26.1 - Bathrooms Completed & Other Bits

End of week 26 saw the below all being completed or started:


-          Wall tiles complete.
-          Benchtops in for the kitchen.
-          Painting started
-          Niches done with mosaics
-          Benchtops in bathroom complete
-          Sinks on in the bathroom
-          Kitchen sink went in
-          Painting started
-          Cupboard doors painted
-          Window architraves painted
-          Stairwell gypbrocked
-          Mosaic tiles in bathroom complete
-          Air vent cutouts done
-          Power point cutouts done

Also, more good news is that our SS called and said we may be able to have walk through in 4 weeks!

We are beyond excited at this point. Cannot believe this is actually happening and that we may be in our brand new home next month! 

Some photos below :) 

Shower Niche Mosaic Tiles

Vanity tops and sink

ensuite Shower

Ensuite Vanity

Air vent cutouts

Leisure Room Electrical Cutout

Kitchen Sink

Kitchen Benchtops

Powder Room

Laundry


Single Toilet Upstairs

Main Bath Upstairs Shower

Sunday, June 24, 2018

Week 22: Waterproofing Complete!

Waterproofing was completed this week in upstairs and downstairs wet areas. Not much else was done. Staircase was meant to go in but I think they are waiting for next week for the tiling.

Pictures as promised!














Week 21: Gyprock Complete

Gyprock has been done and dusted this week - things moving swiftly along which we are so glad to see.

Photos to come in upcoming posts!