Monday this week was our handover.
I am so exhausted with this process and just completely written off. We have started to take a few things to the house this week and doing a few external bits and pieces like concrete pathway and fencing before we move in so our little furry child can come with us once we move completely.
Appliances go in tomorrow and someone from sentinel alarms should be there to install our ducted vacuum. I think it will start to feel much more surreal once we are sleeping there but never the less, feels amazing to know its all over and that we can start enjoying our home.
Anyone else who is building, good luck with the rest of your build or the start of your build wherever in the process you may be.
I will be uploading photos, sometime after we have all of our furniture in and after we start our landscaping.
Our pool should be starting hopefully by mid to late October.
Watch this space......
This blog is to tell the story of our build. No comments or opinions are meant to offend or be malign. This blog is purely to document our experiences of the journey of our house build. We will not be held accountable for anyone else's comments about a mentioned builder. If builder name is mentioned and offence is taken, please contact us ASAP for us to edit or remove said comment or post from blog before taking further action.
Showing posts with label handover. Show all posts
Showing posts with label handover. Show all posts
Tuesday, September 25, 2018
Monday, August 13, 2018
Week 29: Shower Screens, Mirrors, Alarm & Main Floor Tiling
Week 29 saw most things being done which was kinda taking ages to do.
The below are what has been completed:
- Shower Screens
- Mirrors
- Alarm System
- Ducted Vacuum Fit out
- Patching for Final Coat of Paint
- Main floor tiling
- Alfresco Tiling done
- Feature Tiling done
Still to be completed:
- Rails for Bathrooms
- Door Locks
- Garage Door
- Laundry tub to go in
- Laundry shoot still to be cut out
- Electrical - some light switches still need to be done
- Shelving in pantry/linen/wardrobes
- Final coat of Paint
- Glass blocks in Granny Flat
- Carpet
- Driveway
- Kitchen Splash back
I feel like there is still so much to do!
Contacted our SS today and he said he has started our handover procedure and will contact us as soon as he knows of a handover date. As per usual.... not wanting to commit to a date.
Below are some photos!
The below are what has been completed:
- Shower Screens
- Mirrors
- Alarm System
- Ducted Vacuum Fit out
- Patching for Final Coat of Paint
- Main floor tiling
- Alfresco Tiling done
- Feature Tiling done
Still to be completed:
- Rails for Bathrooms
- Door Locks
- Garage Door
- Laundry tub to go in
- Laundry shoot still to be cut out
- Electrical - some light switches still need to be done
- Shelving in pantry/linen/wardrobes
- Final coat of Paint
- Glass blocks in Granny Flat
- Carpet
- Driveway
- Kitchen Splash back
I feel like there is still so much to do!
Contacted our SS today and he said he has started our handover procedure and will contact us as soon as he knows of a handover date. As per usual.... not wanting to commit to a date.
Below are some photos!
Upstairs Main Shower
Alfresco
Leisure Tiling
Alfresco
Porch
Alfresco Tiles & Feature
Ensuite Shower
Ensuite
Upstairs Main Bath
Porch Feature Tiles
Sunday, August 5, 2018
Week 28.1: Photo's & Updates
Update on what still needs to be completed:
1. Shower screens
2. Bathroom Rails
3. Door Locks
4. Garage Door
5. Mirrors
6. Laundry Tub
7. Laundry shoot needs to be cut out
8. Finish off Electrical (Power Point fittings etc)
9. Alarm System
10. Ducted Vacuum hole cutouts
11. Pantry Shelving
12. WIR Shelving
13. Driveway
14. Kitchen Splashback
15. Final Coat of paint
16. Main Floor Tiling
17. Second Floor & Stairs Carpet
I feel like there's really not much to be done and yet WH wants to have handover in 4 weeks. Just seems like a heck of a long time. Not looking good. We probably won't be able to be in the house by my birthday and even after handover, we will still have SO much to do!
This list below reflects our plans post handover:
1. Concrete around the house to create a path all the way around.
2. Need to get plans made for the pool we want to build ASAP.
3. Once these plans are through, dig and fill with concrete.
4. Pave the area around the pool.
5. Fencing
6. Small veggie patch
7. Flower garden at the front near the three windows.
8. Pebble the front instead of grass.
9. Vertical flower garden near the alfresco area
10. Build a shed for tools etc.
I feel like this list is really never going to end. Seems futile to resist the challenges we are going to face at this point. Not to mention how much money it's going to cost. Mood: Bleh
Anyway here are some photo's
1. Shower screens
2. Bathroom Rails
3. Door Locks
4. Garage Door
5. Mirrors
6. Laundry Tub
7. Laundry shoot needs to be cut out
8. Finish off Electrical (Power Point fittings etc)
9. Alarm System
10. Ducted Vacuum hole cutouts
11. Pantry Shelving
12. WIR Shelving
13. Driveway
14. Kitchen Splashback
15. Final Coat of paint
16. Main Floor Tiling
17. Second Floor & Stairs Carpet
This list below reflects our plans post handover:
1. Concrete around the house to create a path all the way around.
2. Need to get plans made for the pool we want to build ASAP.
3. Once these plans are through, dig and fill with concrete.
4. Pave the area around the pool.
5. Fencing
6. Small veggie patch
7. Flower garden at the front near the three windows.
8. Pebble the front instead of grass.
9. Vertical flower garden near the alfresco area
10. Build a shed for tools etc.
I feel like this list is really never going to end. Seems futile to resist the challenges we are going to face at this point. Not to mention how much money it's going to cost. Mood: Bleh
Anyway here are some photo's
Shower in the laundry
Where the Laundry Tub will be
Powerpoint in Laundry
Powder Room
Powder Room Toilet
Under Stairs
Ensuite Double Vanity
Ensuite Toilet
Ensuite Shower
Main Bath Vanity
Upstairs Main toilet
Upstairs Main Shower
Upstairs Main Bath
Rangehood