Showing posts with label door locks. Show all posts
Showing posts with label door locks. Show all posts

Sunday, August 26, 2018

Week 31: Glass blocks, Pantry Shelving and Kitchen Splash back

So its WEEK 31 and there has only been three things that have been done in ONE WHOLE WEEK.

Sigh, you can imagine my frustration at this stage.

1. Glass blocks for granny flat done
2. Pantry shelving completed
3. Kitchen Splash Back in.

Still to be completed:

1. Door locks
2. Rest of the light switches and powerpoint caps need to be placed on.
3. Rails for bathrooms need to be completed.
4. Laundry tub needs to go in.
5. Laundry shoot needs to be cut out
6. Linen & Walk in robe shelving
7. Aircon Unit
8. Carpet
9. Driveway

I feel like this damn list is never ending. Realistically we should be in by now, but who knows when that will be cause our supervisor hasn't been in contact with us for almost TWO WEEKS.

Yeah I can't wait until this is over. To be honest, I am more over it than excited. It sucks.

I don't have pictures this week cause I refuse to give them free marketing this week for only doing THREE things on the list of many to be done. Almost two weeks over the contract date. Wonder what the excuse is this time.........

Sunday, August 5, 2018

Week 28.1: Photo's & Updates

Update on what still needs to be completed: 

1. Shower screens
2. Bathroom Rails
3. Door Locks
4. Garage Door
5. Mirrors
6. Laundry Tub
7. Laundry shoot needs to be cut out
8. Finish off Electrical (Power Point fittings etc)
9. Alarm System
10. Ducted Vacuum hole cutouts
11. Pantry Shelving
12. WIR Shelving
13. Driveway
14. Kitchen Splashback
15. Final Coat of paint
16. Main Floor Tiling
17. Second Floor & Stairs Carpet

I feel like there's really not much to be done and yet WH wants to have handover in 4 weeks. Just seems like a heck of a long time. Not looking good. We probably won't be able to be in the house by my birthday and even after handover, we will still have SO much to do!

This list below reflects our plans post handover: 

1. Concrete around the house to create a path all the way around.
2. Need to get plans made for the pool we want to build ASAP.
3. Once these plans are through, dig and fill with concrete.
4. Pave the area around the pool.
5. Fencing
6. Small veggie patch
7. Flower garden at the front near the three windows.
8. Pebble the front instead of grass.
9. Vertical flower garden near the alfresco area
10. Build a shed for tools etc.

I feel like this list is really never going to end. Seems futile to resist the challenges we are going to face at this point. Not to mention how much money it's going to cost. Mood: Bleh

Anyway here are some photo's

Shower in the laundry

Where the Laundry Tub will be 

Powerpoint in Laundry 


Powder Room 

Powder Room Toilet 

Under Stairs 

Ensuite Double Vanity 

Ensuite Toilet 

Ensuite Shower 

Main Bath Vanity 

Upstairs Main toilet

Upstairs Main Shower 

Upstairs Main  Bath 



Rangehood