Week 28.1: Photo's & Updates

Update on what still needs to be completed: 

1. Shower screens
2. Bathroom Rails
3. Door Locks
4. Garage Door
5. Mirrors
6. Laundry Tub
7. Laundry shoot needs to be cut out
8. Finish off Electrical (Power Point fittings etc)
9. Alarm System
10. Ducted Vacuum hole cutouts
11. Pantry Shelving
12. WIR Shelving
13. Driveway
14. Kitchen Splashback
15. Final Coat of paint
16. Main Floor Tiling
17. Second Floor & Stairs Carpet

I feel like there's really not much to be done and yet WH wants to have handover in 4 weeks. Just seems like a heck of a long time. Not looking good. We probably won't be able to be in the house by my birthday and even after handover, we will still have SO much to do!

This list below reflects our plans post handover: 

1. Concrete around the house to create a path all the way around.
2. Need to get plans made for the pool we want to build ASAP.
3. Once these plans are through, dig and fill with concrete.
4. Pave the area around the pool.
5. Fencing
6. Small veggie patch
7. Flower garden at the front near the three windows.
8. Pebble the front instead of grass.
9. Vertical flower garden near the alfresco area
10. Build a shed for tools etc.

I feel like this list is really never going to end. Seems futile to resist the challenges we are going to face at this point. Not to mention how much money it's going to cost. Mood: Bleh

Anyway here are some photo's

Shower in the laundry

Where the Laundry Tub will be 

Powerpoint in Laundry 


Powder Room 

Powder Room Toilet 

Under Stairs 

Ensuite Double Vanity 

Ensuite Toilet 

Ensuite Shower 

Main Bath Vanity 

Upstairs Main toilet

Upstairs Main Shower 

Upstairs Main  Bath 



Rangehood 



Sunday, July 15, 2018

Week 26: Kitchen Benchtop's & Bathroom Wall Tiles

I know I just gave an update for end of week 25 however, hubby was on site today to check on the build and sent me these photos which practically almost stopped my heart from excitement.

Monday - we have had the wall tiles started, kitchen bench tops went in AND PAINTING HAS STARTED!

One more bit of good news is that hubby spoke to the tiler today and he gave us an insight and said the main floor tiles are due to be laid in 2 weeks along with the carpet after all the inside finishing are done! Does this mean they are going to push to have all the mirrors all the screens. all the everything else done by two weeks? What?! Lets hope this is the case cause I just really need to be in my new home!

Its really starting to look like a home now and I am beyond excited.

Below photos :)




Week 25: Bathroom Tiling Started & Other Bits

So, end of week 25 saw quite a bit of work completed which was amazing news to my ears!

- Bathroom floor tiling completed
- Bathroom vanities complete.
- All sliding doors and internal doors in as well as cupboard doors.
- Mosaic tiles were laid on the floor ready to be laid behind the sinks and inside the niches.
- Architraves finished.

Also, we are excited to say we finally went to Beacon Lighting and chose pendants for our dining room, alfresco and stairwell. All up this cost us about $800.00. Also deciding if we would like Sean their electrician to fit them for us as if we decide this, we would receive an extra year warranty on our alfresco fan/light. Something to think about I guess....

On another note, the only thing I packed this weekend was my printer. We ended up purchasing one of those internet dongle things (because we don't currently have internet at our place) and we ended up watching 13 reasons why on Netflix all weekend which was probably one of the best weekends I had in a while.

Anywho, we are now 4 weeks from contract date. Lets see what else is in store for the forthcoming days/weeks.